Plant Commissioning with Testing: Experts Ensure Smooth Sailing Functioning of the Plant

Plant Commissioning with Testing: Experts Ensure Smooth Sailing Functioning of the Plant
4 min read

Ferroalloy plants are where different types and qualities of ferroalloys are manufactured. Ferroalloys are essential raw materials in steel making and several other sectors. The choice of ferroalloys for a specific purpose depends on the industry’s requirements and desired characteristics. Being a complex manufacturing facility, a ferroalloy plant needs to function accurately. Dozens of different types of machines and equipment including high-voltage electric sources and furnaces are used in these plants. That’s why plant commissioning with testing before commercially running the plant is so important.

Let’s understand the vital steps in ferroalloy plant establishment, i.e. plant commissioning and detail testing.

What is plant commissioning and testing?

Plant commissioning and testing is the methodical and complete process of preparing a plant with all its tools and machinery, equipment, raw materials, and power sources for full-scale commercial operation. Plant commissioning and testing have several steps. Take a look:

  • Planning and preparation

Prior to commissioning, the expert engineers undertake detailed planning and preparation. In this planning and preparation, various aspects related to the commercial operation of the plant are considered such as the scope of work, objectives, responsibilities of workers and departments, workers’ safety matters, emergency matters, etc. The commissioning team designs a detailed plan for their systematic functioning. They ensure nothing is left or ignored.

  • Functional testing

The second step in commissioning is functional testing of each and every machine, component, tool, and equipment individually as well as part of a larger system or sub-system. The testing of motors, valves, instrumentation, pumps, and all other parts including the tiniest components is done systematically. The plant commissioning with testing team ensures that even the smallest parts are functioning properly.

  • Integrated testing

After individual testing, the different systems are tested for their expected function at different levels of output. Through integrated testing, the commissioning and testing team ensures that the whole plant is perfectly coordinated and the integrated machine, equipment, and components are working as expected.

  • Performance testing

In this step, the commissioning team evaluates the performance of the plant as a whole in different conditions like when the demand is high the furnace may need to take an extra load, or when the weather condition is not good like too hot outside the systems may experience more pressure.

  • Safety testing

The commissioning and testing team takes safety matters as a priority. Sarojini Group makes the safety of the plants the top priority as hundreds of workers work in plants where complex machines and furnaces are running day and night. In this matter, businesses also need to adhere to the safety standards laid down by the appropriate authorities and related laws like labor laws, chemical safety laws, and environmental protection laws.

  • Environmental compliance testing

Every plant needs to adhere to environmental compliance matters laid down by local and state authorities. The commissioning and testing team checks everything related to it.

  • Documentation

Whatever is done to understand the health of the systems and the plant as a part of the plant commissioning with testing is properly documented with all procedures followed and test results for future reference. This is also required for the compliance with rules and regulations of the land.

Plant commission and testing prior to commercial activities of the plant are necessary for ensuring that the plant as a whole and all its machine parts and systems are running smoothly. Sarojini Group sends an expert team of engineers, designers, and technicians having years of experience in this intricate job. The experts verify and document systematically for the complete satisfaction of the owner before the plant starts manufacturing ferroalloys commercially.