What Are the Steps to Remodel a Bathroom?

What Are the Steps to Remodel a Bathroom?

The overall remodelling concept is complicated, but the most intricate is bathroom remodelling. As bathroom remodelling deals with numerous water and electricity pathways and also involves several fixtures, planning it methodically will be very helpful. But renovations are equally important and necessary. Hence, please read below to know the consecutive steps involved in Bathroom Remodelling services in Toronto and how you plan it.

8 Steps to Complete a Bathroom Renovation

With proper planning and structuring appreciably, finishing a bathroom renovation is quite easy. Here, we will help you through the ten consecutive steps required to complete a bathroom renovation in Toronto.

  • Plan The Budget

Whether you appoint a contractor or decide to do it yourself, the first step is to budget your plan. Choose what changes you want and how much better quality you can afford. Since the higher the price, the better the quality. Also, consider the expense of appointing professionals. I suggest that you opt for proper contractors rather than doing it yourself. Since it is an investment, you want it to be equal.

  • Choose The Design

Once the budget is fixed, choose the design accordingly. While selecting the designs of the components, make sure you are deciding wisely. Focus on more than just the style and appeal but also the necessity and functionality. Also, opt for designs that would fit the bathroom space well.

  • Demolition

The next step is the breaking down of the structure:

  1. It would help if you switched off all electricity and water supplies.
  2. Remove all the fixtures and accessories like faucets, baths, mirrors, holders, etc.
  3. Prepare the floor and walls for the renovations.

Once the entire structure is devoid of everything, we will get on to the next step.

  • Plumbing and Electrical

There are four major alterations in plumbing: changing the shower controls, installing a shower tab or pan, and redoing the plumbing lines. The electrical section consists of increasing the circuit's power to support more appliances, relocating or adding new outlets, bringing the vent fan closer to the shower head, etc. In this step, the numerous plumbing and electrical lines are also fixed.

  • Put Up the Drywall

In this step, you will close up the walls. Regarding bathroom renovation in Toronto, it is better to choose cement boards for potentially dampened walls like those around the shower or the toilet. Since it is resistant to water, it will elongate the walls' longevity. You can opt for dry walls for the rest.

  • Painting and Flooring

Once the walls are fixed, you have reached the procedure's end. You are just left with painting the walls and tiling the floor. Both your paint and tiles should be able to resist water and moisture. Meanwhile, tiling begins with the shower walls or the bathtub before the rest.

  • Installations

Here comes the last step of the process. Here, you must begin installing the amenities and accessories like tubs, toilets, showers, lighting, exhaust fans, sinks, vanity, mirrors, towel bars, cupboards, etc.

Wrapping Up

Bathroom renovation is a very hectic process. It is thus important to choose professional hands to complete bathroom remodelling in Toronto accurately and with a better experience.

James Adams is the author of this article. To know more about Led Lighting Toronto please visit our website: lucky5group.ca

In case you have found a mistake in the text, please send a message to the author by selecting the mistake and pressing Ctrl-Enter.